The following are a sampling of some of the New Building projects that we have done:
|
Wastewater Treatment Plant Stony Brook, NY
Owner: Suffolk County Dept. of Public Works
Contract Amount: $8,988,000.00
Project Description: New 2.5 MGD waste water plant including final settling tanks, oxidation ditch, 75,000 sf sludge building, 2,500 sf screen building, 10,000 sf main pump station, 10,000 sf lab building, pumps, piping and controls.
|
|
Bldg. 19 Complex Modernization, Stratford Army Engineer Plant Stratford, CT
Owner: U.S. Army Corps of Engineers
Contract Amount: $7,000,000.00
Project Description: Enclosure of seven (7) industrial buildings into one 75,000 pre-engineered steel building complex. All trades disciplining of construction were involved, along with multiple subcontracts.
|
|
Combat Control Team Building Ft. Bragg, NC
Owner: U.S. Army Corps of Engineers
Contract Amount: $3,300,000.00
Project Description: 40,000 sf 4-story pre-engineered offices, training rooms. All trades, site work, utilities.
|
|
Construction of Dewatering Facility at Building 3507Radford AAP Radford, VA
Owner: Alliant Ammunition & Powder Co.
Contract Amount: $1,054,446.39
Contact: Mark Alderman
(540) 639-7529
Project Description: New three (3) story, 18,000 gross square foot building from the ground up. New concrete footings, Q deck and slabs for three (3) floors. 700 tons structural steel frame with acid resistant coating, 9,000 sf chlorinated rubber coated steel siding, blast resistant doors. Metal roofing. Install 2,200 lf stainless steel piping from 2” through 10”. Install processing machinery. Project was performed in an explosives manufacturing facility. All work done to strict safety requirements and stringent quality control procedures. Complete turnkey building to house ammunition manufacturing machinery.
|
|
Other Work Package Fort Bragg, NC
Owner: U.S. Department of the Army
Contract Amount: $337,412.51
Contact: Jim Gehle
(910) 396-1211 x 211
Project Description : Design and install new concrete foundation and building slab. Design and install 12,000 sf pre-engineered steel building. Install site utilities and electric. Demolish existing concrete sludge beds, remove hazardous soils.
|
|
Chemical Waste Treatment Plant Textron Lycoming, CT
Owner: Textron Lycoming, Inc.
Contract Amount: $4,000,000.00
Project Description: 50,000 sf 2-story pre-engineered steel building for plating facility; pumps, drains, sludge tanks, sludge building, control sludge filter press, piping.
|
|
Repair Boilers & Controls, Bldg. G-650, MCB Camp Lejeune, NC
Owner:
Contract Amount: $2,000,000.00
Project Description: Add 7,000 sf steel building to existing boiler plant, install (1) 200,000 #/hr water tube boiler with piping, structural supports and replace refractory on (2) existing CE boiler’s with new controls. Replace existing storage tank oil heaters and pre-heater skid with new, convert boilers to dual fired gas/oil.
|
|
Construct Bath Houses Badin Lake National Park, NC
Owner: USDA, National Forest Service
Contract Amount: $668,827.19
Contact: Jan Walthall
(828) 257-4293
Project Description: This project is the first task order issued under an IDIQ contract with the USDA. The project is to develop a campground in a National Forest.Construct three (3) 2,000 sf bathhouses, 1 masonry mechanical equipment building and 1 well building all of masonry with natural field stone veneer and standing seam roofs. Install new septic system including leaching fields, 3,100 lf of wastewater distribution piping and septic tanks. Install new 250' deep x 5" diameter well with pumping system and 1,200 lf of water distribution piping. Install new electrical distribution.
|
|
Reconstruction of Van Hook Campground Van Hook Campground, NC
Owner: U.S. Department of Agriculture
Contract Amount: $470,000.00
Contact: Mark Miller
(803) 516-4020
Project Description: Supply and install new 500 sf well house, 2,000 sf bath house, new septic structures, sitework, concrete work, site utilities, roads, plumbing, mechanical and electrical work..
|
|
Construction of GroupCamp Shower House Badin Lake, NC
Owner: U.S. Dept. of Agriculture
Contract Amount: $120,634.00
Contact: Jan Walthall
(828) 257-4393
Project Description: This project is the second task order issued under an IDIQ contract with the USDA. Survey, develop site for new campground shower houses. Construct one (1) 1,000 sf bathhouse and one (1) 500 sf mechanical equipment building all of masonry with natural field stone veneer and standing seam roofs. Install new septic system including leaching fields, 300 1f of wastewater distribution piping and septic tanks.
|
|